|
Days 1 800-280-8862
At the start, stakes located the area to be dug and the site had some dried brush which was quickly demolished. The ground appeared solid in the beginning
but was quickly turned to dust. The pit was dug down to about 2 feet and graded so that the base of it was firm.
|
||||||||