Days 2 to 5 800-280-8862
Now we are at elevation for the slab. The third picture shows a footprint outside the area of soil compaction. The front of the house will be located a similar
distance from the street as the homes to the left and right in the pictures. Foreign dirt mixed with gravel was trucked in, spread and compacted. Rain
threatened and the rest of the fill was put off to the next day. The last pictures are the completed and compacted pad.
|
|||||||||||||||||||||