Pea gravel is brought in , trenches are dug for the footings and plumbing. Forms are set in place, plumbing installed and and concrete is poured ( sorry no pictures on that).
Diesel is poured on the concrete to improve the set. The well driller arrives and takes a much needed break.
         The well driller takes a break
                                                                                                                                                                                                                                                                                                           