Days 25 to 33 800-280-8862
All the framing is complete and the R19 insulation is in the exterior walls and parts of the ceiling. The first pictures are the frame for the entertainment center.
Outside the roof is papered, the sides are foam insukated and prepared for stucco. The cement tiles are on the roof. In the last picture, the tubes for pouring
the front columns have been installed.
|
|||||||||