BACK    DAY 1  2  6  15  25  34  40  50  65  75  90  120
  Days 34            800-280-8862
The excavation and setting of the septic tank have been completed. The top pictures show the black pipe from the house and the white pipe exiting the septic
out to the leach lines. These lines are then set in among gravel for a pourous drain. Further on is shown the great room during drywall and mudding.
                CONVERTIBLE OFFICE / BEDROOMS
              CONVERTIBLE OFFICE / BEDROOMS
                            VIEW OF THE KITCHEN AREA
                     SEPTIC LINES TO RIGHT OF THE HOUSE
          VIEW LOOKING FRONT TOWARD SITTING ROOM
          GREAT ROOM FROM THE MASTER BEDROOM

                                                                                                                                                                                                                                                                                                           
BACK    DAY 1  2  6  15  25  34  40  50  65  75  90  120