Days 34 800-280-8862
The excavation and setting of the septic tank have been completed. The top pictures show the black pipe from the house and the white pipe exiting the septic
out to the leach lines. These lines are then set in among gravel for a pourous drain. Further on is shown the great room during drywall and mudding.
|
||||||||||||