The pace of construction is fantastic. Today the house received its first stucco coat, dark picture, and was complete by 3PM. The next day a stipple coat was
applied to the walls. Then the moon rise showed up over the mountain. The walk, driveway and rear patio were laid out. Next few days the concrete was poured
and interior doors, trim and shelving was installed. And the two pictures  with palm trees are not the finished product, but it is the local Best Western hotel and
RV park. The last two show the front of the home and view from the rear of the house.                                          

                                                                                                                                                                                                                                                                                                           